University of Southern California
Washington, DC
University of Southern California
CCS provided engineering, on-site integration,
training and documentation for the entire facility. The project spanned several months and included the installation of flat panel displays, projectors projection screens along with other AV
systems and components. CCS also installed
room control systems and provided engineering
and installation support for a Christie MicroTile
display system deployed in the Center’s lobby.
Project Goal
USC designed and built a state of the art $70
million, 11,000 square foot training and practice facility for their world-renowned football
team. Each position has it’s own meeting
space. The entire facility is outfitted with
audio visual systems to support the Coaches,
Trainers and Student Athletes efforts.